crane machine 1)Pendant control orcabin control or remote control. 2)Single or double speed of steel wire rope hoist. (or chain hoist) 3)Using single speed cage mo
single beams gantry crane 1)Pendant control orcabin control or remote control. 2)Single or double speed of steel wire rope hoist. 3)Using single speed cage motor or wound roto
single beam bridge crane 1)Pendant control orcabin control. 2)Single or double speed of steel wire rope hoist. 3)Using single speed cage motor for travelling or traversing cr
eot overhead crane 1)Pendant control orcabin control or remote control. 2)Single or double speed of steel wire rope hoist. 3)Using single speed cage motor or wound roto
overhead crane Conventional configuration: overhead cran
Slewing Jib Crane Conventional configuration: 1) Installation site altitude does not surpass 2000m. When the altitude surpass 1000m, the motor's capability must be ch
semi-goliath crane Legs are attached to the bridge structure at one end, to enable the crane to run on the ground track, and standard crane end carriages on the other s
overhead crane Conventional configuration: 1)Pendant control orcabin control
double beams gantry crane MHS double girder gantry crane Conventional scheme:pendant control orcabin control, single or double speed rope hoist, use single speed motor or chan
single girder crane 1)Pendant control orcabin control or remote control. 2)Single or double speed of steel wire rope hoist. (or chain hoist) 3)Using single speed cage mo
BM gantry crane use in warehouse span:4-20m work level:A3-A4 tons:2-16
double girder overhead crane with hook 1)Cabin control or pendant control . 2)Driver'scab is opened or closed types. 3)Wound rotor motor is used on each mechanism, changed speed by resista
Overhead Crane with Grab This equipment is specially used for balk cargo and granule materiel. Conventional configuration: 1)Cabin control. 2) Driver's room is opened or clo
bridge crane 1)Pendant control orcabin control or remote control. 2)Single or double speed of steel wire rope hoist. 3)Using single speed cage motor or wound roto
single girder gantry crane 1)Pendant control orcabin control or remote control. 2)Single or double speed of steel wire rope hoist. 3)Using single speed cage motor or wound roto
overhead cranes lifting 1)Pendant control orcabin control or remote control. 2)Single or double speed of steel wire rope hoist. (or chain hoist) 3)Using single speed cage mo
Double Girder Gantry Crane Conventional configuration: 1)Cabin control or pendant control. 2) Driver's room is opened or closed types. 3) Wound rotor motor is used on each mech
bridge crane Overhead crane 1)Pendant control orcabin control or remote control. 2)Single or double speed of steel wire rope hoist. 3)Using single speed cage moto
single girder gantry crane with CE certification single girder gantry crane with CE certification 1)Pendant control or remote control. 2)Single or double speed of steel wire rope hoist. 3)Using sing
gantry crane MHS double girder gantry crane Conventional scheme:pendant control orcabin control or remote control, single or double speed rope hoist, use single s
gantry crane with electric hoist 1)Pendant control orcabin control. 2)Single or double speed of steel wire rope hoist. 3)Using single speed cage motor or wound rotor motor for travel
single girder overhead crane with CE overhead crane with CE certification 1)Pendant control orremote control. 2)Single or double speed of steel wire rope hoist. 3)Using single speed cage
overhead crane with CE certification overhead crane with CE certification 1)Pendant control orremote control. 2)Single or double speed of steel wire rope hoist. 3)Using single speed cage